ADU PERMIT SUBMISSIONS
Professional ADU Permit Management From Start to Approval
Permit submission is one of the most confusing and time-consuming parts of building an ADU. Each city and county has its own requirements, portals, review process, and expectations, which can overwhelm homeowners who are unfamiliar with the system.
Our permit submission service is designed to remove that burden. We manage the entire process on your behalf, from opening the permit portal to delivering a fully approved, ready-to-build permit. This allows you to move forward with clarity, confidence, and fewer delays.
COST Calculator
How Much is Your Custom ADU?
Note: The calculations are approximate.
OPENING THE CITY OR COUNTY PERMIT PORTAL
Setting Up Your Project the Right Way From the Start
Every ADU permit begins with opening an official city or county permit portal under your property. This step establishes your project within the local planning system and creates the foundation for all reviews, corrections, and approvals that follow.
Our team handles this setup carefully, ensuring the project is categorized correctly and submitted to the appropriate departments. Proper setup at this stage helps avoid administrative delays and prevents your application from being misrouted or rejected early in the process.
SUBMITTING THE FULL PERMIT PACKAGE
Accurate, Complete, and Code-Compliant Submissions
Once the portal is established, we submit the full permit package on your behalf. This includes all required plans, drawings, engineering documents, energy reports, and supporting materials needed for review.
Submitting a complete and coordinated package is critical. Missing or inconsistent documents are one of the most common reasons permits are delayed. Our approach ensures that reviewers receive everything they need to evaluate your project without unnecessary back-and-forth.

CLIENT COORDINATION AND REQUIRED INFORMATION
Making Sure Nothing Is Missed
Permit submission often requires specific information, approvals, and signatures from the homeowner. We work closely with you to gather all required details and explain what is needed at each step.
Our team guides you through documents, authorization forms, and any homeowner-specific requirements. This collaborative approach ensures your permit moves forward without delays caused by missing information or incomplete submissions.
MANAGING RED LINES AND CORRECTIONS
Responding to City Comments Efficiently
After submission, most permits go through one or more rounds of review. Cities typically issue red lines or correction comments that must be addressed before approval.
We manage this process by reviewing comments, coordinating revisions with designers and engineers, and resubmitting corrected documents. Handling red lines efficiently is key to keeping your project moving and avoiding unnecessary downtime during plan review.
DELIVERING A READY-TO-BUILD PERMIT
Approval You Can Move Forward With
Our goal is not just submission, but approval. We stay involved until your permit is fully approved and issued by the city or county.
Once approved, you receive a ready-to-build building permit that allows construction to begin. This milestone provides clarity, confidence, and the legal authorization required to move into the construction phase of your ADU project.
ADU TYPES
What Is Your Accessory Dwelling Unit Type?
Every property and homeowner goal is different. Before moving forward, it helps to identify the ADU type that best fits your situation. When you are ready, we can help you review your options and determine which ADU type makes the most sense for your property.
Custom Tiny Homes
A detached ADU designed for strong rental demand, offering a standalone layout that supports higher monthly income.

Garage Conversion
An ADU that turns existing space into a cash-flow unit with lower construction costs and faster returns.

WHY PROFESSIONAL PERMIT SUBMISSION MATTERS
Fewer Delays and Clearer Expectations
Permit submission errors often lead to months of delay, frustration, and repeated corrections. Professional management helps reduce these issues by ensuring accuracy, consistency, and timely responses throughout the review process.
By handling submissions and communication with the city, we help protect your timeline and reduce stress while keeping you informed at every stage.
WHO THIS SERVICE IS FOR
Essential for Any ADU Requiring Permits
Our permit submission service is ideal for:
- Homeowners who want professional handling of city approvals
- Owner-builders unfamiliar with local permit systems
- Homeowners combining design, engineering, and permitting
- Investors managing one or multiple ADU projects
If your ADU requires permits, this service ensures the process is handled correctly and efficiently from start to finish.
Our Recent Projects
Real ADU Planning and Design Work
We have helped homeowners across Southern California take the first step toward successful ADU projects. Our recent work includes property evaluations, design planning, and permit preparation for a wide range of ADU types and lot conditions.
This section will showcase examples of recent projects, including site layouts, 3D models, and completed ADUs, giving you a better sense of how planning turns into real results.
MOVE FORWARD WITH CONFIDENCE
Schedule a Free ADU Consultation
Permit submission should feel structured and manageable, not overwhelming. We offer a free ADU consultation and land inspection to explain how the permit process works and what to expect before moving forward.


